Boiler Blowdown Rate

Calculate boiler blowdown rate based on steam consumption, feed water TDS concentration, and maximum allowable TDS in boiler water.

Boiler Blowdown Rate Calculator

A blowdown of the boiler is a routine operation necessary due to the increased concentration of Total Dissolved Solids (TDS) in the boiler water when producing steam.

The blowdown rate can be calculated using the formula:

qBD = qS × fc / (bc - fc)

Where:

  • qBD = blowdown rate (kg/h)
  • qS = steam consumption (kg/h)
  • fc = Total Dissolved Solids (TDS) in the feed water (ppm)
  • bc = maximum allowable Total Dissolved Solids (TDS) in the boiler water (ppm)
Calculator

Inputs

Results

Blowdown Rate-- kg/h
ParameterValueUnitDescription
Steam Consumption (qS)Inputkg/hAmount of steam consumed in the process
Feed Water TDS (fc)InputppmTotal Dissolved Solids concentration in feed water
Max Boiler Water TDS (bc)InputppmMaximum allowable TDS concentration in boiler water
Blowdown Rate (qBD)Outputkg/hRequired blowdown rate to maintain TDS levels